SETTING STANDARDS
EXPERIENCE - Knowledge - systems - performance
West Angelas Power Station
About The Project
The West Angelas Power Station project is part of Rio Tinto’s 360 million tonnes per annum project to support the expansion of its iron ore mining operations in the Pilbara.
The 80MW open cycle power station is being built using low emission GE LM6000 PF sprint gas turbines. The units will be dual fuelled with the capacity to run on natural gas or diesel.
The 80MW open cycle power station is being built using low emission GE LM6000 PF sprint gas turbines. The units will be dual fuelled with the capacity to run on natural gas or diesel.
What We Did
Supplied and installed:• Formwork, Reinforcing steel and concrete for electrical pits,• Concrete hardstands and foundations,• Concrete cutting and mastic jointing, grouting,• Core drilling,• Plant and equipment hire,• Detailed earth works• Labour hire.FRC Group completed installation of the structural components of street lighting and various concrete and civil components of the project, as well as plant hire and skilled labour hire.